Skip to content
PropSurvival
Verification Record

MyFundedFutures — Verification Record

Latest recorded check: · 6 recorded checks

Builder · Our recorded checks and their evidence. A corpus correction does not establish when a firm changed its rules.

Value stands · re-sourcing citation

looked · cited sentence not found at 2 URL(s)

Inspect citation findings

Citation findings

The recorded source wording was not found at the following locations. This does not establish that the firm's rule changed.

Dated source-check records

  • Confirmed, no changes

    Builder · Normal corpus review current first party

    USD 25,000 · USD 50,000 · recorded field scope; not a whole-plan verification

    Field-by-field: 3 confirmed (3 fields touched this pass).

    Manifest row 143; auto_promote:false; Builder25K/50K accountvariants separately scoped;25KnoDLL/1000MLL, one day/noevalconsistency. EODbalance/equity and breachcadence uncertainty held rather than movingengine. Scoped field review, not whole-plan acceptance. Held fields are deliberately absent from the confirmation map.

    consistency: confirmed max drawdown type: confirmed min trading days: confirmed

    No prior value is evidenced for this check. This is a record of our research, not a firm rule effective date.

    Link to this check
  • Confirmed · sources disagree on 0 field(s)

    Builder · Normal corpus review current first party

    USD 25,000 · USD 50,000 · recorded field scope; not a whole-plan verification

    Manifest row 144; auto_promote:false; Builder25K lock initial+100 is stated; selected source also describes EOD equity versus closed balance and25K/50K productvariants. Lock-only qualification does not resolve whole drawdown basis/breach cadence. Scoped field review, not whole-plan acceptance. Held fields are deliberately absent from the confirmation map.

    No prior value is evidenced for this check. This is a record of our research, not a firm rule effective date.

    Link to this check
  • Confirmed · sources disagree on 0 field(s)

    Builder · Normal corpus review current first party

    USD 25,000 · USD 50,000 · recorded field scope; not a whole-plan verification

    Manifest row 145; auto_promote:false; MyFundedFutures explicitly counts open losses at EOD; corpus balance_eod versus equity-at-EOD and intraday evaluation distinctions unresolved. No engine semantics inferred. Scoped field review, not whole-plan acceptance. Held fields are deliberately absent from the confirmation map.

    No prior value is evidenced for this check. This is a record of our research, not a firm rule effective date.

    Link to this check
  • Confirmed, no changes

    Builder · Normal corpus review current first party

    USD 25,000 · USD 50,000 · recorded field scope; not a whole-plan verification

    Field-by-field: 2 confirmed (2 fields touched this pass).

    Manifest row 142; auto_promote:false; Builder25K/50K accountvariants separately scoped;25KnoDLL/1000MLL, one day/noevalconsistency. EODbalance/equity and breachcadence uncertainty held rather than movingengine. Scoped field review, not whole-plan acceptance. Held fields are deliberately absent from the confirmation map.

    daily loss amount pct: confirmed max drawdown amount pct: confirmed

    No prior value is evidenced for this check. This is a record of our research, not a firm rule effective date.

    Link to this check
  • Recorded value changed on re-read

    Builder · Official page fetch quote substring

    USD 25,000 · USD 50,000 · recorded field scope; not a whole-plan verification

    Field-by-field: 2 confirmed · 1 corrected (3 fields touched this pass).

    U22e payout provenance 2026-09-06. Builder: split 80, cycle 2 qualifying days from 25k help table. first_payout_after_days LEFT NULL — official first wait is 48 hours, and this field is days (writing 48 would mean 48 days). 48h quote recorded here, not modelled: “You may request a payout 48 hours after your first trade has been placed, provided that all required payout criteria have been met.”

    payout cycle days: changed payout first payout after days: confirmed payout profit split pct: confirmed

    payout cycle days · USD 25,000
    Previous value unavailable — The recorded check date differs from the commit date; historical backfill cannot establish a value change.

    payout cycle days · USD 50,000
    Previous value unavailable — The recorded check date differs from the commit date; historical backfill cannot establish a value change.

    Link to this check
  • Confirmed, no changes

    Builder · Two independent readers, each working blind to the other’s output and to the stored value

    USD 25,000 · USD 50,000 · recorded field scope; not a whole-plan verification

    Field-by-field: 6 confirmed (6 fields touched this pass).

    Builder plan, both blind passes (pass A from the prior run, pass B this run) agree: target $1,500(25k)/$3,000(50k), max drawdown $1,000/$2,000, min 1 day, EOD trailing, consistency correctly NONE in evaluation (the 50% is a payout-cycle gate). The size difference is real and non-interpolable: 25k has NO daily loss limit, 50k has a $1,000 soft-pause DLL - our corpus already encodes exactly this. UNVERIFIABLE (preserved): the drawdown lock threshold - our value is initial+$100; the firm publishes "static once MLL reaches $0" for the live stage only and leaves the evaluation-stage lock unstated; whether the DLL counts unrealized and its reset time are absent. Corpus unchanged.

    consistency: confirmed daily loss amount pct: confirmed max drawdown amount pct: confirmed max drawdown type: confirmed min trading days: confirmed profit target pct: confirmed

    No prior value is evidenced for this check. This is a record of our research, not a firm rule effective date.

    Link to this check

Earlier record links

These retained links open the complete size and program membership of the earlier grouped record. Each distinct check now has its own link.

2026-10-04 · earlier grouped record

2026-09-06 · earlier grouped record

2026-07-22 · earlier grouped record

What the rules say now

profit target pct (same across all modelled sizes)

All sizes6
Profit Target $1,500
retrieved sourced

min trading days (same across all modelled sizes)

All sizes1
Consistency Rule None Minimum Trading Days 1 Day News Trading Allowed Drawdown Model EOD Trailing
retrieved sourced

daily loss amount pct

250000
Max EOD Drawdown (MLL) $1,000 Starting Minimum Balance $24,000 Daily Loss Limit None
retrieved sourced
500002
Max EOD Drawdown (MLL) $1,000 Starting Minimum Balance $24,000 Daily Loss Limit None
retrieved sourced

max drawdown amount pct (same across all modelled sizes)

All sizes4
Max EOD Drawdown (MLL) $1,000 Starting Minimum Balance $24,000 Daily Loss Limit None
retrieved sourced

max drawdown type (same across all modelled sizes)

All sizestrailing
Consistency Rule None Minimum Trading Days 1 Day News Trading Allowed Drawdown Model EOD Trailing
retrieved sourced

max drawdown basis (same across all modelled sizes)

All sizesend-of-day balance
trails ... new end-of-day highs
retrieved sourced

max drawdown locks (same across all modelled sizes)

All sizes[object Object]
locks ... $100 above the starting balance
retrieved sourced

consistency (same across all modelled sizes)

All sizes
Consistency Rule None Minimum Trading Days 1 Day News Trading Allowed Drawdown Model EOD Trailing
retrieved sourced

Rules and their verification status change without notice; the firm's own documentation is always the final authority. This page is independent research, not investment or trading advice, and PropSurvival is not affiliated with, endorsed by, or sponsored by MyFundedFutures.