PropSurvival
Glossary

Phase 2 / Verification

Part of Pass conditions in the PropSurvival glossary — defined the way the engine actually measures it.

Funded = phase 1 × phase 2Phase 2 / Verification
The second evaluation step in 2-step programs: typically half the Phase 1 target under the same drawdown rules. Funding requires passing both — which is why an honest funded probability is Phase 1 × Phase 2, not the Phase 1 number alone.P(funded) = P(phase 1) × P(phase 2)
See this mechanic move your own numbers.

Pick a firm, type your stats, and watch pass probability, failure causes, and expected fee spend respond — free, in your browser, nothing uploaded.

Run your analysis — free